Genesis (Undisclosed)

Project Info

Project Location:

San Mateo, CA

Architect:

Undisclosed

General Contractor:

Undisclosed

Detailed Project Scope Overview

Door & Frame Installation

We installed clear anodized aluminum frames with paint grade wood doors. Glazing by others.

Hardware Integration

Door hardware consisted of Satin Chrome hinges, cylindrical locks and floor stops.

Timeline Management

Material lead time was 4 weeks and installation was completed in 1 day.

Scroll to Top