Premium Door Installation for Corporate Headquarters

Commercial Door Project

Project Location:

Oakland, California – Corporate headquarters building requiring modern door solutions.

Services Provided:

Hollow metal doors, aluminum frames, hardware installation, and automatic operators throughout multiple floors.

Timeline:

Completed in 7 weeks, including planning, installation, testing, and quality verification.

High-Quality Commercial Door Upgrades for Corporate Office Renovations and Modern Interiors

The corporate headquarters renovation required a full upgrade of all commercial doors and hardware. Kasbrook conducted thorough planning, installation, and testing to ensure safety, accessibility, and aesthetic consistency. Hollow metal and aluminum doors were installed across multiple floors, with precise fitting and hardware integration. Automatic door operators were calibrated and tested for smooth operation. Coordination with contractors and facility managers ensured compliance with all building codes and minimized operational disruptions. Documentation was provided for future maintenance. This project highlights Kasbrook’s ability to handle large-scale corporate renovations, delivering durable, functional, and visually appealing door solutions that meet the needs of employees, visitors, and facility management alike.

Detailed Project Scope Overview

Kasbrook provided a full range of commercial door services, including custom installations, hardware integration, compliance verification, and quality assurance for every doorway in the project.

Door Installation

We installed hollow metal, aluminum, and wood doors throughout the office, ensuring proper alignment, smooth operation, and long-lasting durability for high-traffic areas.

Hardware Integration

All door hardware, including locks, closers, and handles, were carefully installed and tested to meet safety standards and ensure seamless functionality throughout the building.

Timeline Management

Project planning, procurement, and installation were carefully scheduled to complete all work within six weeks, minimizing office downtime and maintaining consistent project quality.

Scroll to Top